Roundtable Engineering Solutions - Stag > Projects > Pile Foundation for LNG Tank
Cheniere 032406 046

Pile Foundation for LNG Tank

Page-8-Image-40

Work Scope

  • Elevated 275’ Dia LNG Tank Foundation
  • Precast/Pre-stressed Piles w/ Pile Cap
Page-8-Image-41

Technical Challenges

  • Foundation required to be elevated
  • Poor soil conditions
  • Hurricane wind speeds
  • Large anchorage demands

Contact us for your construction or engineering project.

Request A Quote