Roundtable Engineering Solutions - Stag > Projects > Aircraft Hangars (200’ X 200’)
20190125_100440 (1)

Aircraft Hangars (200’ X 200’)

20190125_100956

Work Scope

  • Structural Design of Hangar
  • Structural Detailing
  • Coordination with Chinese fabricator
  • Coordination with client
1

Technical Challenges

  • Chinese fabricator required extensive detailing
  • Over 8000 parts
  • Remote island location
  • Tight schedule

Contact us for your construction or engineering project.

Request A Quote